Our clients demand a fast, predictable build programme that minimises disruption to their clients during the construction phase as well as striving to eradicate any post construction defects so the running of the schools can remain undisturbed.
i-SIP by Innovare can easily meet these demands as our Project teams engage at a very early point in the design process to challenge the build sequence to ensure its as tight as possible whilst our Manufacturing facility in Coventry meets exacting tolerances of /-2mm providing product of the highest quality to ensure negligible post-construction settlement.
The James Review forecasts energy costs to rise a staggering £100m in the next 12 to 24 months and schools are rightly as concerned about the running costs of their estate as the capital expenditure prompting principal contractors to mitigate these financial pressures. Innovare has recognised this and have undertaken extensive work through our Technical department using SAP calculation comparisons of SIPS and traditional methods to establish that a 48% saving in space heating costs can be achieved
By working closely together and continually adapting to the many challenges of this sector we will continue to provide exceptional solution.