The i-SIP structural insulated panel building system from Innovaré has been used
on a number of different schemes, from social and private housing to education,
commercial and leisure. Over 200 homes have been built using i-SIP system build,
demonstrating the exceptional thermal performance and speed of build benefits of
the structural insulated panels and the confidence our clients have in SIPs technology.
Please see below for a selection of our downloadable project case studies using
the i-SIP structural insulated panel building system.
Sustainable Housing
Mid Street
Innovaré Systems Ltd teamed up with Raven Housing Trust and Osborne to supply the dry structure for the first live project to achieve Level 5 of the Code for Sustainable Homes (CSH).
Gallon Close
Innovaré teamed up with Osborne and Family Mosaic Housing Association to complete an affordable housing development in Greenwich, South London built to level five of the Code for Sustainable Homes (CSH) using the i-SIP structural insulated panel system.
Affordable Housing
Kender
The i-SIP building system was selected for the third phase of the £57m Kender housing project in South London. Using its 162mm i-SIP panel, Innovaré has supplied a full structural kit for the scheme to meet level three of the Code for Sustainable Homes (CSH).
Oliver Crescent
West Kent Housing Association selected Innovaré’s i- SIP building system for an affordable housing scheme including seven detached, a pair of semi-detached homes and three terraced houses built to meet level three of the Code for Sustainable Homes (CSH).
Tottenham
A restrictive site and lack of space for material storage posed a significant challenge for Innovaré who had teamed up with Osborne on a 44 unit mixed use affordable housing scheme in Tottenham, North London for London & Quadrant Housing Association.
Gordon Road
Innovaré worked closely with Baily Garner Architects and Osborne to provide its i-SIP structural insulated panel building system for a Code for Sustainable Homes (CSH) level three project on behalf of Hexagon Housing Association.
Sumner Gardens
The London Borough of Croydon was looking to significantly reduce the carbon emissions of its first housing development in over 19 years. Innovaré worked alongside main contractors Osborne to provide a highly insulated ‘room in the roof’ for the 13 new units.
Frenches Road
The speed of installation and offsite construction advantages offered by Innovaré?s Structural Insulated Panel (SIP) system were among the key benefits brought to a new social housing scheme at Merstham in Surrey for Amicus Horizon.
Healthcare
Lister Hospital
A project to upgrade and expand the existing Radiology Department at Lister Hospital on behalf of East & North Heartfordshire NHS Trust saw Innovaré and Osborne work closely together.
Stepping Hill Hospital
Innovaré designed, engineered and manufactured its i- SIP wall panel as an infill solution for the development of a new neo-natal unit at Stepping Hill Hospital, Stockport, where speed of installation was critical to minimise disruption to the site.
Education
Davison School
Innovaré Systems recently revisited one of its key projects at Davison School, Worthing, constructed during the summer of 2007. The aim was to find out how the students, teachers and staff have settled into their new building 12 months on.
Private Housing
Steep
A high quality development of three executive, detached homes in the quaint and picturesque village of Steep in Hampshire has demonstrated the versatility of the i-SIP structural insulated panel building system from Innovaré.
Leisure
Hindleap Warren
The large format i-SIP structural insulated panel building system from Innovaré has been used to construct a new accommodation block at the Ashdown Forest Visitors Centre, East Sussex.
Design


