Connor Downs & St Uny Schools: Flexibility of i-SIP panelised systems key to unlocking solution for rapid build

Cornwall County Council had two school projects that posed significant logistical constraints for a traditional build, due to limited access and very rapid turnaround requirements. To complete the criteria, they also wanted minimal disruption with the schools being in operation at the time of the build. Working alongside Kier Construction Innovaré were able to deliver a solution that met the tight timeframes for both projects without compromising quality and minimising disruption.